Optimizing the Application of Conventional RTG Electrification to Increase Efficiency with the Cost Benefit Analysis (CBA) Method

Authors

  • Melky Gloria Samosir Industrial Engineering Department, Universitas Pattimura, Ambon, Indonesia Author
  • Marcus Tukan Industrial Engineering Department, Universitas Pattimura, Ambon, Indonesia Author
  • Marcy L. Pattiapon Industrial Engineering Department, Universitas Pattimura, Ambon, Indonesia Author

DOI:

https://doi.org/10.70716/reswara.v4i4.767

Keywords:

Cost Benefit Analysis, RTG Electrification, Investment Feasibility, Net Present Value, Operational Efficiency

Abstract

The operation of diesel-powered Rubber Tyred Gantry (RTG) cranes at PT Pelindo Terminal Petikemas Ambon is associated with several challenges, including high fuel consumption, substantial maintenance costs, and frequent engine failures that disrupt container handling activities. To address these issues, the company plans to convert the conventional RTG into an Electric Rubber Tyred Gantry (E-RTG). This study aimed to evaluate the investment feasibility of the RTG electrification project using the Cost Benefit Analysis method. A quantitative approach was employed using primary data collected through field observations, interviews, and company documentation. The analysis included the identification of investment costs, operating costs, maintenance costs, and economic benefits resulting from the electrification project. Investment feasibility was evaluated using the Net Present Value, Internal Rate of Return, Payback Period, and Cost Benefit Analysis ratio. The results indicate that the electrification project can generate annual operational cost savings of IDR 1,229,334,168, consisting of fuel cost savings of IDR 1,032,486,918 and maintenance cost savings of IDR 196,847,250. The financial evaluation produced a Net Present Value of IDR 1,320,903,256, an Internal Rate of Return of 7.89%, a Payback Period of 5.74 years, and a Cost Benefit Analysis ratio of 1.159 (>1). These findings demonstrate that the RTG electrification project is financially feasible and can significantly improve operational efficiency at the container terminal.

References

Achmadi, T., & Khaqiqi, A. S. (2020). Model Perhitungan Penerapan Konsesi Pelabuhan di Indonesia Calculation Model for Port Concession Application in Indonesia. Jurnal Ilmiah Teknologi Maritim, 14(2), 73–82. https://ejournal.brin.go.id/jurnalwave/article/view/2460/1537

Alginat Romadhon, M. (2024). Strategi Operasional dan Pemeliharaan Preventif untuk Meningkatkan Keandalan dan Kinerja Alat Rubber Tyred Gantry (RTG) di Pelabuhan. Jurnal Ilmiah Wahana Pendidikan, 10 (24), 206–211. http://jurnal.peneliti.net/index.php/JIWP/article/view/9187/7829

Ankel-Peters, J., Bensch, G., Moull, K., Rauschenbach, M., & Sievert, M. (2025). Cost-effectiveness of rural energy access strategies. Energy Policy, 203(1), 1–4. https://doi.org/10.1016/j.enpol.2025.114633

An-Nisa Addawiyah, S., & Suroso, A. (2025). Analysis of The Influence of Management, Technical, and Digitalization Factors on Cost Performance through Green Shorebase Performance Based on Value Engineering. INERSIA, 21(2), 163–172. https://doi.org/10.21831/inersia.v21i2.85387

Cholidis, D., Sifakis, N., & Arampatzis, G. (2026). A marine-based hybrid renewable energy optimization framework for cost and emission reduction in nearly zero-energy ports. Journal of Ocean Engineering and Marine Energy1, 1(1), 1–35. https://doi.org/10.1007/s40722-026-00509-x

Dewi, A. M., L Pambudi, M. A., & Bumi Akpelni, P. (2023). Optimalisasi Fasilitas Listrik Dermaga dan Peningkatan Keandalan Auxiliary Engine Kapal terhadap Efisiensi Biaya Operasional Kapal di Pelabuhan Tanjung Emas. Saintara : Jurnal Ilmiah Ilmu-Ilmu Maritim, 7(2), 1–6. https://doi.org/10.52475/saintara.v7i2.190

Dibaba, H., Demidov, I., Vanadzina, E., Honkapuro, S., & Pinomaa, A. (2022). Feasibility of rural electrification and connectivity—A methodology and case study. Applied Energy, 315(1), 1–11. https://doi.org/10.1016/j.apenergy.2022.119013

Dwisetiono, & Irianto, B. D. M. (2022). Jurnal Midship Analisa Kelayakan Investasi Alih Fungsi Barge menjadi Oil Barge 5000 DWT. Jurnal Teknik Perkapalan Um Surabaya, 4(1), 16–23. https://doi.org/10.30651/ms.v4i1.10580

Febriani, S. diah ayu. (2024). Analisis Tekno Ekonomi Pemasangan PLTS Rooftop On Grid 120 Kw (Studi Kasus PLTS di PT Santinilestari Energi Indonesia). Jurnal Teknik Terapan, 2(2), 24–33. https://doi.org/10.25047/jteta.v2i2.31

Fitria, F., Adibrata, S., & Wibowo, T. A. (2021). Kelayakan Usaha Perikanan Drift Gillnet Di Pelabuhan Perikanan Nusantara (PPN) Sungailiat Kabupaten Bangka. Journal of Tropical Marine Science, 4(2), 79–83. https://doi.org/10.33019/jour.trop.mar.sci.v4i2.2100

Irawan. (2022). Alternatif Pembiayaan Investasi Proyek Pembaharuan Infrastruktur Pelabuhan. Syntax Literate: Jurnal Ilmiah Indonesia, 7(6), 7098–7112. https://doi.org/10.36418/syntax-literate.v7i6.6662

Kersey, J., Popovich, N. D., & Phadke, A. A. (2022). Rapid battery cost declines accelerate the prospects of all-electric interregional container shipping. Nature Energy, 7(7), 664–674. https://doi.org/10.1038/s41560-022-01065-y

Khaqiqi, A. S., Rahayuningsih, S., Al Hazman, M., & Putra, G. H. (2024). Analisis dan Perancangan Sistem Informasi Pada Pelayaran Rakyat Secara Terintegrasi (Studi Kasus: Muatan Kapal Rakyat). Jurnal Ilmiah Teknologi Maritim, 18(02), 52–62. https://doi.org/10.55981/wave.2024.8053

Prasetyo, Y., Eni Nuraini, H., & Metty Trisna Negara, K. (2025). Analisis Kelayakan Pembangunan Dermaga Apung Hiu Paus di Desa Labuan Jambu Kecamatan Tarano Kabupaten Sumbawa. Jurnal SainTekA, 6(3), 103–110. https://doi.org/10.58406/sainteka.v6i3.2159

Pratama, Y. B. (2021). Analisis Kelayakan Finansial Pembangunan Koneksi Pelabuhan Kapal Ro-Ro Dumai-Malaka Metode Deterministik Financial Feasibility Analysis Development of Ro-Ro Ship Port Connections Dumai-Malacca Deterministic Method. Jurnal Saintis, 21(2), 97–104. https://doi.org/10.25299/saintis.2021.vol21(02).7584

Pratiwi, A. D., Karua, R., Priharto, F. J., Setiaswan, R. W., & Abduh, S. (2026). A Financial Analysis of the Archipelagic Electricity System’s 10 Mw Mobile Reserve Margin Provision Using the Lct Platform. Inovasi Pembangunan – Jurnal Kelitbangan, 14(1), 1–9. https://doi.org/10.35450/jip.v14i1.1661

Putra, I. J., Nisumanti, S., & Baniva, R. (2025). Studi Kelayakan Jalan Lingkar Pangkal Pinang – Batu Bariga Sadai. Jurnal Ilmiah Tekno Global, 14(1), 19–24. https://doi.org/10.36982/jtg.v14i01.5218

Ramadhana, R. R., Prayitno, Y. A. K., Irfan Bahiuddin, Setyawan Bekti Wibowo, & Sugiyanto. (2025). Sistem Integrasi (ISO 50001) Dengan Kombinasi Chi-Square Test Untuk Analisis Manajemen Penggunaan Energi Operasional Alat Berat Pada Perusahaan Terminal Pelabuhan. Jurnal Teknologi Dan Rekayasa Alat Berat, 2(2), 28–34. https://doi.org/10.22146/jtrab.v2i2.14637

Rania, K., Kustiani, I., & Siregar, A. M. (2025). Analisis Tekno Ekonomi Pengembangan Jalur Kereta Api Rencana Areal Terminal Untuk Kepentingan Sendiri Pelabuhan Panjang. REKAYASA: Jurnal Ilmiah Fakultas Teknik Universitas Lampung, 29(1), 1–5. https://doi.org/10.23960/rekrjits.v29i1.107

Rigsun, I. N. (2021). Pemanfaatan Limbah Serat Plastik Vinil Sebagai Bahan Tambahan Genteng Beton. Jurnal Teknik WAKTU, 8(1), 108–126. https://doi.org/10.36456/waktu.v8i1.860

Setiawan, D. A., & Prenata, G. D. (2024). Sistem Kendali Motor Penggerak Trolley Pada Unit Rubber Tyred Gantry Berbasis PLC. Jurnal Teknik Elektro Dan Komputasi (ELKOM), 6(2), 184–190. https://doi.org/10.32528/elkom.v6i2.22816

Shofi’i, I., Taqiyuddin, & Kasrani, M. W. (2024). Aliran Daya dan Kebutuhan Energi Listrik Pelabuhan Kontainer: Kajian Perencanaan Elektrifikasi dan Profitabilitas di PT. Kaltim Kariangau Terminal. JTE UNIBA, 9(1), 511–517. https://doi.org/10.36277/jteuniba.v9i1.294

Temesgen, A. L., & Bekele, G. (2025). GIS-based assessment of economically feasible off-grid mini-grids in Ethiopia. Discover Energy, 5(1), 1–11. https://doi.org/10.1007/s43937-025-00073-9

Downloads

Published

2026-09-05

How to Cite

Samosir, M. G., Tukan, M., & Pattiapon, M. L. (2026). Optimizing the Application of Conventional RTG Electrification to Increase Efficiency with the Cost Benefit Analysis (CBA) Method. RESWARA: Jurnal Riset Ilmu Teknik, 4(4), 1147-1165. https://doi.org/10.70716/reswara.v4i4.767