Delay Risk Factors in Foundation Works Using SEM and Multi-Group Analysis
DOI:
https://doi.org/10.70716/reswara.v4i3.557Keywords:
Construction Delay, Foundation Works, Risk Factors, Project Time Performance, Structural Equation ModelingAbstract
Delays in construction projects continue to be a significant problem in infrastructure development, especially in foundation works where field uncertainties are common. This study aims to identify the dominant delay risk factors and examine their influence on project time performance. A quantitative approach was applied using questionnaires distributed to construction professionals, and the collected data were analyzed using Partial Least Squares Structural Equation Modeling (PLS-SEM) and Multi-Group Analysis (MGA). The results indicate that equipment and productivity factors as well as financial and administrative factors have significant effects on project time performance, while other factors were not statistically significant. The structural model showed moderate explanatory power with an R² value of 0.471. The findings also revealed a discrepancy between perceived importance and actual impact, where technical factors were perceived as highly important but operational and financial factors showed stronger direct effects on project execution. In addition, no significant differences were found between contractors and consultants. It was concluded that mitigation strategies should prioritize operational and financial aspects to effectively reduce delays in foundation works.
References
Ahmed, M., & Xu, W. (2023). Investigation of pile construction and productivity loss: An analysis of macro impact factor. World Journal of Engineering and Technology, 11(4), 932–964. https://doi.org/10.4236/wjet.2023.114062
Aldammak, M. M., Hamzah, N. B., & Khoiry, M. A. (2025). Pilot study on delay factors and solutions strategies in government buildings projects in Kuwait: Stakeholders’ perspectives using confirmatory factor analysis (CFA). Buildings, 15(14), 2420. https://doi.org/10.3390/buildings15142420
Alsanabani, N. M., Al-Gahtani, K. S., Almohsen, A. S., & Alsharef, A. (2023). Risk interdependency network model for the cost and time of pile installation in Saudi Arabia using partial least squares structural equation modeling. Applied Sciences, 13(19). https://doi.org/10.3390/app131910886
Alshammari, A., & Ghazali, F. E. M. (2024). A comprehensive review of the factors and strategies to mitigate construction projects delays in Saudi Arabia. The Open Construction & Building Technology Journal, 18(1). https://doi.org/10.2174/0118748368318470240806113627
Assaf, M., Hussein, M., Alsulami, B. T., & Zayed, T. (2022). A mixed review of cash flow modeling: Potential of blockchain for modular construction. Buildings, 12(12). https://doi.org/10.3390/buildings12122054
Chandra, S. S., Sepasgozar, S. M. E., Kumar, V. R. P., Singh, A. K., Krishnaraj, L., & Awuzie, B. O. (2023). Assessing factors affecting construction equipment productivity using structural equation modeling. Buildings, 13(2). https://doi.org/10.3390/buildings13020502
Cohen, J. (1992). A power primer. Psychological Bulletin, 112(1), 155–159. https://doi.org/10.1037/0033-2909.112.1.155
Fashina, A. A., Omar, M. A., Sheikh, A. A., & Fakunle, F. F. (2021). Exploring the significant factors that influence delays in construction projects in Hargeisa. Heliyon, 7(4). https://doi.org/10.1016/j.heliyon.2021.e06826
Gandi, A., Yusuf Tululi, M., & Usman Sumaga, A. (2025). Evaluation of costs and time for the implementation of bore pile foundation work for the BPK RI apartment project in Gorontalo City. Research Review Jurnal Ilmiah Multidisiplin, 3(2), 289–298.
Hair, J. F., Hult, T. M., Ringle, C., Sarstedt, M., Danks, N. P., & Ray, S. (2021). Partial least squares structural equation modeling (PLS-SEM) using R: A workbook. Springer. https://doi.org/10.1007/978-3-030-80519-7
Hassan, A., & Riaz, A. (2024). Analysis of skilled labor shortage in the construction industry of developing countries. Building Engineering, 3(1), 1–12. https://doi.org/10.59400/be2054
Henindia, R., & Suroso, A. (2022). Analysis of the factors causing delay in pile foundation work for medium-story building project. Journal of Applied Science, Engineering, Technology, and Education, 4(1), 27–38. https://doi.org/10.35877/454RI.asci850
Henseler, J., Ringle, C. M., & Sarstedt, M. (2016). Testing measurement invariance of composites using partial least squares. International Marketing Review, 33(3), 405–431. https://doi.org/10.1108/IMR-09-2014-0304
Irankunda, G., Zhang, W., Abdullahi, U. I., Fernand, M., David, B., & Jean-Petit, S. (2025). Understanding critical delay causative factors and their mitigation measures in Burundi communal construction projects: A factor analysis and structural equation modeling approach. Buildings, 15(3), 473. https://doi.org/10.3390/buildings15030473
Jhantasana, C. (2023). Should a rule of thumb be used to calculate PLS-SEM sample size. Asia Social Issues, 16, 1–23.
Khatib, B., Poh, Y. S., & El-Shafie, A. (2020). Delay factors management and ranking for reconstruction and rehabilitation projects based on the relative importance index (RII). Sustainability, 12(15). https://doi.org/10.3390/su12156171
Kuo, C. P., & Vo, D. H. (2025). Causes of delays occurring in linear projects: A survey of prestressed concrete sheet pile retaining wall constructions in Taiwan. Slovak Journal of Civil Engineering, 33(2), 11–25. https://doi.org/10.2478/sjce-2025-0008
Likert, R. (1932). A technique for the measurement of attitudes. Columbia University Press.
Liu, Y., Ng, Y. C. H., Zhang, Y., Yang, P., & Ku, T. (2023). Incorporating geotechnical and geophysical investigations for underground obstruction detection: A case study. Underground Space, 11, 116–129. https://doi.org/10.1016/j.undsp.2022.12.003
Mahirah Sharuddin, N., Azrai Azman, M., Abdul Samad, Z., & Mohd Rodzi, R. (2024). Relationship between schedule delay factors and project performance in civil engineering works. Built Environment Journal, 21, 23–36. https://doi.org/10.24191/bej.v21iSpecial
Mohdar, W., Serang, R., & Titaley, H. D. (2024). Analysis of factors causing work delays bore pile on the school construction project using fault tree analysis (FTA) methods. PARAMETER: Jurnal Matematika, Statistika, Dan Terapannya, 3(1), 19–32.
Rachmawati, F., Ramadhani, H. D., & Nurhidayah, A. S. (2023). Project delay risk assessment. IPTEK The Journal for Technology and Science, 34(1), 60–71. https://doi.org/10.12962/j20882033.v34i1.16263
Rashid, Y. (2020). Analysis of delay factors and their effects on construction projects. Management Science Letters, 10(6), 1197–1204. https://doi.org/10.5267/j.msl.2019.11.039
Rauzana, A., Zahrah, A., & Dharma, W. (2022). Critical delay factors for construction projects in Central Aceh District, Indonesia. F1000Research, 11, 474. https://doi.org/10.12688/f1000research.110024.1
Sullivan, G. M., & Artino, A. R. (2013). Analyzing and interpreting data from Likert-type scales. Journal of Graduate Medical Education, 5(4), 541–542. https://doi.org/10.4300/JGME-5-4-18
Sungkana, S. R. K., Ratnaningsih, A., & Soetjipto, J. W. (2023). Analisis faktor penyebab keterlambatan pelaksanaan pondasi bore pile menggunakan metode fault tree analysis. Bulletin of Civil Engineering, 3(1), 25–30. https://doi.org/10.18196/bce.v3i1.17491
Tariq, J., & Gardezi, S. S. (2023). Study the delays and conflicts for construction projects and their mutual relationship: A review. Ain Shams Engineering Journal, 14(1). https://doi.org/10.1016/j.asej.2022.101815
Yin, H., Khoo, T. J., Liu, Q., & Li, Y. (2025). Factors influencing schedule management delays on residential projects in China: A case study of Yun Yue Dong Fang Project. Turkish Journal of Civil Engineering, 1–25. https://doi.org/10.18400/tjce.1571706
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Jonathan Natanael, Hans Dermawan, Fenny Septiastuti (Author)

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.