Wicaksono, A., & Zaki, M. (2026). Analysis of Factors Affecting Cost Efficiency and Project Completion Time on the Serang-Panimbang Toll Road. RESWARA: Jurnal Riset Ilmu Teknik, 4(4), 1238-1253. https://doi.org/10.70716/reswara.v4i4.745