(1)
Wicaksono, A.; Zaki, M. Analysis of Factors Affecting Cost Efficiency and Project Completion Time on the Serang-Panimbang Toll Road. Reswara J. Ris. Ilmu Tek. 2026, 4 (4), 1238-1253. https://doi.org/10.70716/reswara.v4i4.745.