[1]
Wicaksono, A. and Zaki, M. 2026. Analysis of Factors Affecting Cost Efficiency and Project Completion Time on the Serang-Panimbang Toll Road. RESWARA: Jurnal Riset Ilmu Teknik. 4, 4 (Sep. 2026), 1238–1253. DOI:https://doi.org/10.70716/reswara.v4i4.745.