[1]
Natanael, J. et al. 2026. Delay Risk Factors in Foundation Works Using SEM and Multi-Group Analysis. RESWARA: Jurnal Riset Ilmu Teknik. 4, 3 (Jun. 2026), 154–170. DOI:https://doi.org/10.70716/reswara.v4i3.557.