Analysis of Factors Affecting Cost Efficiency and Project Completion Time on the Serang-Panimbang Toll Road
DOI:
https://doi.org/10.70716/reswara.v4i4.745Keywords:
top management, human resources, technical factors, external factors, cost efficiencyAbstract
The implementation of innovative construction methods is essential to improve cost efficiency and project completion in infrastructure development. This study analyzes the influence of top management, human resources, engineering, and external factors on project cost efficiency, as well as the effect of project cost efficiency on project completion time in the Serang–Panimbang Toll Road Project through the implementation of the Halfslab method. A quantitative approach with a descriptive design was employed using census sampling involving 58 respondents directly involved in the project. Data were collected through questionnaires and analyzed using Structural Equation Modeling–Partial Least Squares (SEM-PLS). The results indicate that top management (β = 0.273; p < 0.001), human resources (β = 0.344; p < 0.001), engineering (β = 0.272; p = 0.001), and external factors (β = 0.292; p = 0.005) have positive and significant effects on project cost efficiency. Furthermore, project cost efficiency positively and significantly affects project completion time (β = 0.540; p < 0.001). Human resources were identified as the most influential factor in improving cost efficiency. These findings demonstrate that the successful implementation of the Halfslab method depends on effective managerial support, competent human resources, appropriate engineering practices, and proper management of external factors to achieve cost-efficient and timely project completion.
References
Ahmed, R., Mohamad, N. A. Bin, & Ahmad, M. S. (2016). Effect of multidimensional top management support on project success: an empirical investigation. Quality & Quantity, 50(1), 151–176. https://doi.org/10.1007/s11135-014-0142-4
Amran, A. (2019). Faktor Yang Berpengaruh Dalam penerapan value engineering pada pekerjaan d-wall di Bangunan Gedung menggunakan Metoda Rii. Rekayasa Sipil, 8(1), 10–17. https://doi.org/10.22441/jrs.2019.v08.i1.02
Belferik, R., Andiyan, A., Zulkarnain, I., Munizu, M., Samosir, J. M., Afriyadi, H., Rusmiatmoko, D., Adhicandra, I., Syamil, A., & Ichsan, M. (2023). Manajemen Proyek: Teori & Penerapannya. PT. Sonpedia Publishing Indonesia.
Chin, W. W. (1998). The partial least squares approach to structural equation modeling. Modern Methods for Business Research, 295(2), 295–336.
Dong, R., Muhammad, A., & Nauman, U. (2025). The influence of weather conditions on time, cost, and quality in successful construction project delivery. Buildings, 15(3), 474. https://doi.org/10.3390/buildings15030474
Ghozali, I., & Latan, H. (2015). Konsep, Teknik, Aplikasi Menggunakan Smart PLS 3.0 Untuk Penelitian Empiris.
Hair, J., Hult, G. T. M., Ringle, C., & Sarstedt, M. (2022). A Primer on Partial Least Squares Structural Equation Modeling (PLS-SEM).
Kerzner, H. (2025). Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons.
Lestiyono, S. (2025). Hubungan Antara Waktu Pengerjaan dan Jumlah Tenaga Kerja terhadap Efisiensi Biaya Proyek Bangunan Gedung. Jejak Digital: Jurnal Ilmiah Multidisiplin, 1(4), 2425–2432. https://doi.org/10.63822/tz5qd424
Ngwai, F. M., Simba, F., & Oyoo, J. J. (2019). Influence of project management practices on construction cost control of projects in Mombasa County. The Strategic Journal of Business & Change Management, 6(3), 314–330. https://doi.org/10.61426/sjbcm.v6i3.1319
Pratiwi, S., Abduh, M. N., & Yunus, A. Y. (2026). Studi Penerapan Manajemen Konstruksi Pada Proyek Pembangunan Jalan Akses Tol Makassar New Port. Jurnal Penelitian Teknik Sipil Konsolidasi, 4(1), 214–223. https://doi.org/10.56326/jptsk.v4i1.5062
Primantari, F. A. L., Rahayu, S. Y. R. S., & Widodo, Z. D. (2025). A Systematic Review of the Role of Human Resource Management in Enhancing Time and Cost Efficiency in Steel Structure Projects. https://doi.org/10.61132/ijiime.v2i3.330
Ramadhan, M. M., & Kurniasari, M. W. (2024). Analisis Value Engineering untuk Penghematan Biaya Pekerjaan Arsitektur pada Proyek Apartemen X Tangerang Selatan. Jurnal Teknik Sipil, 20(2), 209–223. https://doi.org/10.28932/jts.v20i2.6202
Rivard, S., & Huff, S. L. (1988). Factors of success for end-user computing. Communications of the ACM, 31(5), 552–561. https://doi.org/10.1145/42411.42418
Rogalska, M., Bożejko, W., & Hejducki, Z. (2008). Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling. Automation in Construction, 18(1), 24–31. https://doi.org/10.1016/j.autcon.2008.04.002
Saga, A. A., & Karim, R. A. (2025). Time Cost Trade of Analysis Using Building Information Modelling to Improve Construction Project Effectiveness. Journal Transnational Universal Studies, 3(8), 138–147. https://doi.org/10.58631/jtus.v3i8.173
Santosa, P. I. (2018). Metode penelitian kuantitatif: Pengembangan hipotesis dan pengujiannya menggunakan SmartPLS.
Sari, I. L., Aryani, V., & Santosa, D. P. (2025). Analisis manajemen proyek dalam meningkatkan efisiensi operasional di sektor konstruksi. Indonesian Research Journal on Education, 5(4), 591–595. https://doi.org/10.31004/irje.v5i4.2975
Senouci, A., Al-Abbasi, M., & Eldin, N. N. (2018). Impact of weather conditions on construction labour productivity in Qatar. Middle East Journal of Management, 5(1), 34–49. https://doi.org/10.1504/MEJM.2018.088734
Sugiono, S., & Winarno, S. (2023). Implementasi value engineering (VE) pada proyek jalan oleh konsultan dan kontraktor. Jurnal Manajemen Konstruksi, 9(1), 56–72. https://doi.org/10.55606/jurritek.v2i2.1690
Sugiyono. (2016). Metode Penelitian Kuantitatif, Kualitatif dan R&D. Bandung: PT Alfabet.
Suryawinata, F. A. (2024). Analisis Faktor-Faktor Penyebab Cost Overruns Proyek Konstruksi Gedung: Kajian Literatur Sistematis: Indonesian. Journal of Sustainable Construction, 4(1), 77–88. https://doi.org/10.26593/josc.v4i1.8157
Tanuwihardjo, G. A., & Anondho, B. (2024). Optimalisasi waktu dan biaya pelaksanaan proyek X menggunakan metode least cost analysis. JMTS: Jurnal Mitra Teknik Sipil, 295–304. https://doi.org/10.24912/jmts.v7i1.26678
Tarukan, L. C. (2024). PENERAPAN BIM UNTUK OPTIMALISASI MANAJEMEN BIAYA KONSTRUKSI. Jurnal Rekayasa Konstruksi, 3(2), 71–84. https://doi.org/10.34128/jrk.v3i2.28
Wijaya, H. (2021). Analisis Faktor Eksternal Yang Dominan Terhadap Biaya Overhead Proyek Konstruksi. JMTS: Jurnal Mitra Teknik Sipil. https://doi.org/10.24912/jmts.v4i4.12592
Yamin, S. (2009). Structural Equation Modeling dengan Lisrel ± PLS. Jakarta : Penerbit Salemba.
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Aditya Wicaksono, M. Zaki (Author)

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.