Analisis Perubahan Borrow Area Material Inti Terhadap Harga Satuan Pekerjaan Timbunan pada Proyek Pembangunan Bendungan Jragung, Kabupaten Semarang

Authors

  • Ima Fisriyanto Program Studi Magister Teknik Sipil, Fakultas Teknik Sipil dan Perencanaan, Universitas Trisakti, Indonesia Author
  • Muhammad Zaki Program Studi Magister Teknik Sipil, Fakultas Teknik Sipil dan Perencanaan, Universitas Trisakti, Indonesia Author

DOI:

https://doi.org/10.70716/reswara.v4i3.689

Keywords:

borrow area, core material, dam, unit price, geotechnics

Abstract

This study aims to analyze the effect of changes in the borrow area of core material on the unit price of embankment work in the Jragung Dam Project, Semarang Regency. The research employed a quantitative-descriptive approach using primary data from soil laboratory test results and secondary data obtained from project documents. Samples were selected through purposive sampling from three borrow area locations with a total of 15 testing points. The analysis involved technical and economic evaluations of material suitability, volume availability, and the impact of borrow area changes on construction costs. The results showed that the initial borrow area material did not meet technical specifications and experienced a volume shortage of 294,896.45 m³ due to gravel content, tuffaceous layers, and organic soil. An alternative material source from Gunung Mergi, located 23–25 km from the project site, was selected and met the required technical specifications. However, the change in material source increased the unit price of embankment work from IDR 115,860.00 to IDR 248,478.00 due to longer hauling distances and additional material management requirements, including stockpile utilization to maintain moisture content. The novelty of this study lies in integrating technical material suitability, volume availability, and economic impacts of borrow area changes within a single evaluation framework. The findings provide a practical basis for material source selection, risk management of borrow area changes, and more accurate cost estimation in dam construction projects.

References

Arbad, A. P., Arifin, Z. N., Martina, N., Nindya, E. P., & Nurfa, M. A. (2023). Monitoring Work Progress Of Dam Construction Based On Photogrammetric Point Clouds And Bim: Practical Approach To Teaching Industry. The International Archives Of The Photogrammetry, Remote Sensing And Spatial Information Sciences, Xlviii-5/W1-2023, 1–5. Https://Doi.Org/10.5194/Isprs-Archives-Xlviii-5-W1-2023-1-2023

Birhanu, B., Chemeda, Y. C., Garo, T., & Karuppannan, S. (2024). Evaluation Of Watertightness And Slope Stability Analysis Of Upper Guder Dam, West Showa, Central Ethiopia. Quaternary Science Advances, 15, 100230. Https://Doi.Org/10.1016/J.Qsa.2024.100230

Butchibabu, B., Jha, P. C., Sandeep, N., & Sivaram, Y. V. (2023). Seismic Refraction Tomography Using Underwater And Land Based Seismic Data For Evaluation Of Foundation Of Civil Structures. Journal Of Applied Geophysics, 210, 104934. Https://Doi.Org/10.1016/J.Jappgeo.2023.104934

Djarwadi, D., Suryolelono, K. B., Suhendro, B., & Hardiyatmo, H. C. (2014). Selection Of Soils As Clay Core Embankment Materials For Rock Fill Dams To Resist Hydraulic Fracturing. Procedia Engineering, 95, 489–497. Https://Doi.Org/10.1016/J.Proeng.2014.12.209

Erlangga, E., Sadono, K. W., & Putranto, T. T. (2024). Analisa Perbandingan Penurunan Awal Bendungan Tipe Material Timbunan Urugan Batu Dan Urugan Tanah (Studi Kasus Bendungan Digoel-Papua). Bentang : Jurnal Teoritis Dan Terapan Bidang Rekayasa Sipil, 12(1), 83–96. Https://Doi.Org/10.33558/Bentang.V12i1.7876

Fitria, D. R., Latief, Y., Saleh, T., & Laksono, N. B. (2025). Optimizing Dam Maintenance: An Integrated Bim-Wbs Operational Model. Journal Of Project Management Research, 1(1), 41–53. Https://Doi.Org/10.65303/Journalpmresearch.V1i1.14

Gon, K., Cornelis, R., & Rusdi, E. (2026). Kajian Kelayakan Material Gunung Sebagai Agregat Kelas S Pada Pekerjaan Lentur Jalan Raya. Ge-Stram: Jurnal Perencanaan Dan Rekayasa Sipil, 9(1), 47–52. Https://Doi.Org/10.25139/Jprs.V9i1.10956

Ibrahim, I. O. (2024). Geo-Environmental Assessment: Evidence From Geotechnical And Chemical Insight For Irrigation Purpose, Nigeria. The Progress: A Journal Of Multidisciplinary Studies, 5(4), 34–50. Https://Doi.Org/10.71016/Tp/4x1cj250

Ji, S., & Hu, T. (2019). Construction Simulation And Real-Time Monitoring Research Of Concrete Dam Based On Bim. Iop Conference Series: Earth And Environmental Science, 304(5), 052056. Https://Doi.Org/10.1088/1755-1315/304/5/052056

Karisman, A., & Adipraja, R. (2018). Virtual Reality 3d Bendungan Pasar Baru Irigasi Cisadane Berbasis Desktop. Jurnal Ilmiah Komputasi, 1–8.

Karyawan, I. D. M. A., Hasyim, H., Widianty, D., & Yuniarti, R. (2023). Characteristics Of Asbuton Mix Using Geopolymer Fly Ash Coarse Aggregate As A Substitute For Natural Aggregates. Jurnal Penelitian Pendidikan Ipa, 9(6), 4156–4163. Https://Doi.Org/10.29303/Jppipa.V9i6.3937

Lamas, F., Irigaray, C., & Chacón, J. (2002). Geotechnical Characterization Of Carbonate Marls For The Construction Of Impermeable Dam Cores. Engineering Geology, 66(3–4), 283–294. Https://Doi.Org/10.1016/S0013-7952(02)00048-0

Merdassa, S., Garo, T., Chemeda, Y. C., Karuppannan, S., & Tesfaye, M. (2024). Engineering Geological Investigation Of Gololcha Dam For Evaluation Of Leakage And Abutment Slope Stability, Eastern Ethiopia. Scientific African, 26, E02381. Https://Doi.Org/10.1016/J.Sciaf.2024.E02381

Mohammed Makkiyah, H., Mohammed, T. A., & Abdulridha, R. I. (2025). Effect Of Core Type On Zoned Earth Dams On Total Water Head And Flux. Pertanika Journal Of Science And Technology, 33(1). Https://Doi.Org/10.47836/Pjst.33.1.05

Nugraha, Hermawan, F. D., & Monica, S. (2021). Evaluation Of The Open Diversion Channel Capacity On Margatiga Dam Construction Project Using 6d Bim Analysis. Iop Conference Series: Earth And Environmental Science, 930(1), 012045. Https://Doi.Org/10.1088/1755-1315/930/1/012045

Olofinyo, O. O., Franklin, O. O., Oluwatoyin, F. I., & Odebode, O. S. (2024). Geotechnical Investigation For Subsoil Hazard During Earth Fill Dam Construction. Malaysian Journal Of Geosciences, 8(1), 17–25. Https://Doi.Org/10.26480/Mjg.01.2024.17.25

Putri, W. N., Kusumadi, K., & Nofriadi, N. (2023). Analisis Kelayakan Material Quarry Sungai Alas Sebagai Bahan Lapis Pondasi Atas Perkerasan Jalan. Jurnal Ilmiah Teknik Sipil Agregat, 3(2), 63–73. Https://Doi.Org/10.51510/Agregat.V3i2.1071

Rifanie Gazalie, Hawinuti, R., Muhammad Fauzi, & Muhammad Febri Adam Setiadi. (2022). Perhitungan Kualitas Agregat Menurut Abrasi Dan Berat Jenis, Pada Material Desa Ambungan. Jurnal Gradasi Teknik Sipil, 6(1), 11–22. Https://Doi.Org/10.31961/Gradasi.V6i1.1340

Sari, Y. C., Wahyuningrum, C. A., & Kresnanto, N. C. (2020). Building Information Modeling (Bim) For Dams-Literature Review And Future Needs. Journal Of The Civil Engineering Forum, 6(1), 61. Https://Doi.Org/10.22146/Jcef.51519

Sentosa, G. A., Azzaqy, A., Wardani, S. G., Setyandito, O., Ambiarto, A. S., Pierre, A. J., & Farell. (2023). Construction Scheduling And Monitoring Control Of Dams Based On Bim. Iop Conference Series: Earth And Environmental Science, 1169(1), 012033. Https://Doi.Org/10.1088/1755-1315/1169/1/012033

Downloads

Published

2026-07-31

How to Cite

Fisriyanto, I. ., & Zaki, M. (2026). Analisis Perubahan Borrow Area Material Inti Terhadap Harga Satuan Pekerjaan Timbunan pada Proyek Pembangunan Bendungan Jragung, Kabupaten Semarang. RESWARA: Jurnal Riset Ilmu Teknik, 4(3), 964-983. https://doi.org/10.70716/reswara.v4i3.689