Productivity Improvement through Work Measurement and Time Study Analysis
DOI:
https://doi.org/10.70716/reswara.v2i3.380Keywords:
work measurement, time study, productivity improvement, manufacturing systems, motion analysisAbstract
Productivity improvement remains a critical concern for manufacturing organizations facing increasing competition, cost pressures, and demand variability. Work measurement and time study techniques have long been recognized as systematic approaches to identifying inefficiencies, standardizing operations, and improving overall productivity. This study aims to analyze the effectiveness of work measurement and time study methods in improving productivity across manufacturing environments. A case-based analytical approach was employed, integrating direct observation, stopwatch time study, work sampling, and motion analysis. Standard times were calculated using performance rating and allowance factors, while bottlenecks and non-value-added activities were identified through detailed process mapping. The results indicate that the application of work measurement and time study techniques can reduce cycle time by 15–35%, improve labor productivity by 10–30%, and enhance line balance and workflow efficiency. Comparative analysis with previous empirical studies confirms the robustness of these methods across diverse industrial contexts, including machining, assembly, furniture, forging, and process industries. The study concludes that systematic work measurement and time study analysis provide practical and theoretically grounded tools for sustainable productivity improvement and operational excellence in manufacturing systems.
References
Akarşlan Kodaloğlu, F. (n.d.). Evaluation of the activities carried out in a furniture factory through work and time study. International Journal of Engineering and Innovative Research. https://doi.org/10.47933/ijeir.1175280
Akansel, M., Yagmahan, B., & Emel, E. (n.d.). Determination of standard times for process improvement: A case study.
Bhagat, P., & Ujjainwala, F. (n.d.). Productivity improvement by cycle time reduction using time and motion study: A case study of electrode manufacturing company.
Bhiradi, I., & Singh, B. K. (n.d.). Work measurement approach for productivity improvement in a heavy machine shop.
Chauhan, K. A., Kumar, A., & Shah, J. B. (2022). Maynard operation and sequence technique (MOST) intervention for productivity improvement of manufacturing process—A review. Journal of Manufacturing and Operations Management, 4(3). https://doi.org/10.37591/JOMA.V4I3.183
Che Ani, M. N. B., & Abdul Hamid, S. A. B. (2014). Analysis and reduction of the waste in the work process using time study analysis: A case study. Applied Mechanics and Materials, 660, 971–975. https://doi.org/10.4028/www.scientific.net/AMM.660.971
Dahab, A., Younes, M. A., & Backar, S. (n.d.). Overall equipment efficiency improvement through a lean approach in SME: A case study.
Duran, C., Çetindere, A., & Aksu, Y. E. (2015). Productivity improvement by work and time study technique for earth energy-glass manufacturing company. Procedia Economics and Finance, 26, 109–117. https://doi.org/10.1016/S2212-5671(15)00887-4
Fardiansyah, I., Widodo, T., & Anggraini, W. (n.d.). Pengukuran waktu kerja dengan metode time motion study untuk meningkatkan produktivitas kerja produksi greenware (Studi kasus: PT XYZ). https://doi.org/10.31000/jim.v7i2.6924
Khadijah, I., & Kusumawardhani, A. (n.d.). Analisis pengukuran kerja untuk mengoptimalkan produktivitas menggunakan metode time and motion study.
Kukreja, R. (2022). Application of work measurement to reduce the cycle time in manufacturing firm: A case study. In Supply chain. Springer. https://doi.org/10.1007/978-981-19-7971-2_7
Kumar, G. A., & Shiyas, K. A. (n.d.). Productivity enhancement of an electromechanical relay manufacturing company through work measurement analysis.
Mishra, A., Agnihotri, V., & Mahindru, D. V. (n.d.). Application of Maynard operation sequence technique (MOST) at Tata Motors and Adithya Automotive Application Pvt. Ltd., Lucknow for enhancement of productivity: A case study.
Moktadir, M. A., Ahmed, S., & Tuj-Zohra, F. (2016). Productivity improvement by work study technique: A case on leather products industry of Bangladesh. Journal of Industrial Engineering and Management, 9(4). https://doi.org/10.4172/2169-0316.1000207
Muhamad, M. R., & Mahmood, W. H. W. (n.d.). Productivity improvement through motion and time study.
Nnanna, I., & Arua, J. E. (2022). Productivity improvement through work study techniques: A case of a modern rice mill in Ikwo, Ebonyi State. Journal of Engineering Research and Reports, 23(1). https://doi.org/10.9734/jerr/2022/v23i12777
Patange, V. C., & Rao, R. (n.d.). An effort to apply work and time study techniques in a manufacturing unit for enhancing productivity.
Prajapati, D. R. (n.d.). Productivity improvement of a forging industry using time study technique: A case study.
Rully, T., & Rahmawati, N. T. (n.d.). Perencanaan pengukuran kerja dalam menentukan waktu standar dengan metode time study guna meningkatkan produktivitas kerja pada divisi pompa minyak PT Bukaka Teknik Utama Tbk. https://doi.org/10.34203/JIMFE.V1I1.442
Sabatini, H., Sharanya, V., & Anand, G. S. (2010). Productivity enhancement in the assembly line of a horn manufacturing company. International Journal of Manufacturing Technology and Management, 19(3–4). https://doi.org/10.1504/IJMP.2010.033695
Sridevi, S. (2015). Bottleneck analysis of an automobile industry component. Indian Journal of Science and Technology, 8(31). https://doi.org/10.17485/IJST/2015/V8I31/84222
Tippannavar, R. P., Kulkarni, V. N., & Gaitonde, V. N. (2022). Productivity improvement at actuator assembly section using manual and video work study techniques. In Advances in industrial engineering. Springer. https://doi.org/10.1007/978-981-32-9931-3_13
Tonpe, K. K., Wayzode, R. R., & Patte, S. (n.d.). Productivity improvement for machining process by using time and motion study.
Vekariya, A., & Kumar, A. (n.d.). A review on improvement of workflow and productivity through application of time and motion study technique.
Wayzode, R. R., Tonpe, K. K., & Sathawane, A. (n.d.). A review on productivity improvement for machining process by using time and motion study.
Downloads
Published
Issue
Section
License
Copyright (c) 2024 Muhammad Fajar Ramadhan, Reena Kukreja, Cengiz Duran (Author)

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.